Projects

DOING IT RIGHT, ON TIME, EVERY TIME

Fabrication & Machine Shop

Baker Hughes Corporate Office & Warehouse Complex

Erection of Fencing and Construction of Base for Power System

Fabrication of Chutes- Troy Resources Guyana Inc

Supply, Fabricate and Install 100′ x 46′ x 46′ Multi-Level Office Building- Hardware Depot

Supply, Fabricate and Install 129′ x 119′ x 25′ Steel Building- Republic Bank Guyana Ltd.

Supply, Fabricate and Install 177′ x 38′ x 39′ Steel Warehouse- Permaul’s Trading

Supply, Fabricate and Install 240′ x 160′ x 23′ Aviation Double Hangar- Trans Guyana Airways

Supply, Fabricate and Install 253′ x 12′ x 40′ Warehouse and Office Building- Associated Packers Industries

Design, Supply, Fabricate and Install 482′ x 155′ x 100′ Rice Mill Building- Hakh Rice Mills

Demerara Distillers Limited (DDL)- Supply, Fabricate and Install Utilities Building- 40′ x 100′ x 20′.jpg

Guyana National Shipping Corporation (GNSC)- Supply, Fabricate and Install Warehouse- 140′ x 89′ x 21′

Ministry of Finance- Supply, Fabricate and Install Office Building- 64′ x 51′ x 38′

US Embassy- Guyana- Supply, Fabricate and Install Warehouse- 120′ x 40′ x 20′

Supply, Fabricate and Install Rice Mill- 170′ x 100′ x 100′- A Cayume Hakh and Sons

Fabrication and Installation of 54 in. Discharge Pipe and Pump, Berbice, Region 5- International Imports and Supplies

"Lorem lacus reiciendis illo placerat tempus, temporibus deserunt commodo incidunt error, unde. Facilisis aspernatur. Recusandae illum"
John Doe
CEO At NY Water Park​

Engineering

Supply, Fabrication and Installation of 17′-4″ x 25′-8″ x 33′ Pre-Engineered Building- Sustainable Environmental Solutions Inc. (SES) GYSBI

Design, Supply, Fabricate and Install Storage Bond- David Persaud Investments Limited

Construction Projects

Assemble and Place Modular Containerized Office Units and Supply, Fabricate and Install Staircase and Platform- Sustainable Environmental Solutions Inc. (SES) GYSBI

Assembly and Installation of 83′ x 40′ x 27′ Pre-Engineered Building- Sustainable Environmental Solutions Inc. (SES) GYSBI

Erection and Installation of Gravity Tower over Leach Tanks- Troy Resources Guyana Inc.

Installation of Ball Mill- Troy Resources Guyana Inc.

Installation of Leech Tanks and Gravity Tower- Troy Resources Guyana Inc.

Installation of Rom Bin- Troy Resources Guyana Inc.

Installation of Secondary Crusher and Conveyor System- Troy Resources Guyana Inc.

Installation of Service pipes- Troy Resources Guyana Inc.

Erection of Stockpile Building inclusive of Conveyor System

TESTIMONIALS

Mr. Frank WillisonTrans Guyana Airways
Read More
Zeco has been performing excellent steel fabrication and machining works for Trans Guyana Airways including our Hangars and Office Buildings. They have also adhered to the strict safety protocols at the airport in so doing. I am very satisfied.
Georgetown Chamber of Commerce (GCCI)
Read More
The Chamber recognizes Zeco as a company which has demonstrated good overall performance in the areas of Financial Growth, Customer Satisfaction, Internal Processes Improvements, Employee Relations, Development and Corporate Citizenship.
Mr. Gonzalo A. JustinianiSenior Project Manager, Panco Construction Consultants Inc.
Read More
Throughout our project Zeco performed with a very high level of professionalism and proactiveness, contributing immensely to the success of the project, for which we are grateful. Without a doubt and no reserves, we recommend the services of Zeco Industrial Engineering.
Mr. Tivadar TothConstruction Project Manager, Sustainable Environmental Solutions
Read More
The works were done in a professional manner, high quality and safely, without any accidents, incidents. The commitment and experience of engineering- and the site team of Zeco Industrial Engineering contributed significantly to the successful execution of the construction project.
John Doe
John Doe@username
Read More
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Previous
Next

Zeco has been performing excellent steel fabrication and machining works for Trans Guyana Airways including our Hangars and Office Buildings. They have also adhered to the strict safety protocols at the airport in so doing. I am very satisfied.

Logo of Trans Guyana Airways
Mr. Frank Willison
Trans Guyana Airways

The Chamber recognizes Zeco as a company which has demonstrated good overall performance in the areas of Financial Growth, Customer Satisfaction, Internal Processes Improvements, Employee Relations, Development and Corporate Citizenship.

logo of GCCI
Georgetown Chamber of Commerce (GCCI)

Throughout our project Zeco performed with a very high level of professionalism and proactiveness, contributing immensely to the success of the project, for which we are grateful. Without a doubt and no reserves, we recommend the services of Zeco Industrial Engineering.

Mr. Gonzalo A. Justiniani
Senior Project Manager, Panco Construction Consultants Inc.

The works were done in a professional manner, high quality and safely, without any accidents, incidents. The commitment and experience of engineering- and the site team of Zeco Industrial Engineering contributed significantly to the successful execution of the construction project.

Mr. Tivadar Toth
Construction Project Manager, Sustainable Environmental Solutions

Rentals

nbvn

8-Station Welding Plan

30 ton Truck with 2 ton Hiab

Caterpillar 3 Ton 44 ft Reach 355B Telehandler

Gensets (Ranging from 65-200 KVA)

JCB 510-56 10 Ton 56 ft Reach Telehandler

RT65S 40 Ton Rough Terrain Mobile Grove Crane

RT335 30 Ton Rough Terrain Mobile Terex Crane

RT880E 80 Ton Rough Terrain Mobile Grove Crane

Building

We have worked on multiple projects  for our clients in terms of the building. 

 Fabrication and installation the building

  • Construction of Warehouse
  • Fabrication and Installation of the Warehouse building

Fabrication & Installation of bonds.

Structural Framing

Accordion Content

Construction of the building

Construction of the Document Center Building

Steel Works Completed

Building of the Gold Room

Construction of the building

Construction of the building

"Lorem lacus reiciendis illo placerat tempus, temporibus deserunt commodo incidunt error, unde. Facilisis aspernatur. Recusandae illum"
Margaret Curtis
Director at West​ Project

We Provide the Best Service in Industry​

DOING IT RIGHT, ON TIME, EVERY TIME